Our Service

  • Survey
    Survey

    To fully protect the structure, each attribute of the structure is measured to provide a bespoke and effective scheme of protection.

  • Material
    Material

    Our engineers only use the highest grade of stainless steel (grade 316); with a life expectancy of +20 years.

  • Installation
    Installation

    All units undergo quality control checks before leaving the factory. Every installation is carried out by experienced installers.

  • Post Project Quality Assurance
    Post Project Quality Assurance

    Handover to the client is subject to rigorous inspection before sign off. In addition, we often continue to revisit sites in order to build up our product knowledge.

  • Post Project Installation Feedback
    Post Project Installation Feedback

    Customers, local authorities and members of the public have been kind enough to compliment us on the effectiveness of our approach to pigeon control.

Inappropriate Deterrents

  • Netting

    NettingUnsustainable

  • Spikes

    SpikesUnsafe

  • Wires

    WiresUnmaintainable

© Glide Limited. 09927682. 606 Delta Office Park, Welton Road, Swindon, Wiltshire, SN5 7XF. Website by Outlines Design.